Legislation Details

File #: REP 24 -091    Version: 1 Name:
Type: Informational Report Status: Regular Business
File created: 7/25/2024 In control: Technical Coordinating Committee
On agenda: 8/1/2024 Final action:
Title: SPOT 7 Update - Regional Impact Local Input Points Assignment Alex Rickard / MPO Staff
Attachments: 1. Staff Report, 2. P 7.0 Available Funding, 3. P7_RegionalImpact_LIP_v1
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

SPOT 7 Update - Regional Impact Local Input Points Assignment

Alex Rickard / MPO Staff

 

Body

On May 24, 2024, the NC Department of Transportation released the technical scores for all SPOT 7 projects along with the draft list of programmed Statewide Mobility projects. Statewide Mobility projects that are not programmed are eligible for consideration of programming with Regional Impact funds, a process referred to as “cascading”. Staff will provide a review of the technical scores and draft Statewide Mobility programming results.

 

A target modal mix was presented to the Executive Board for their consideration. The target modal mix is a component of the MPO’s adopted prioritization methodology that guides staff in the development of a draft point assignment.

 

Regional Impact Modal Targets

P 5.0 Target                                                                                     P 7.0 Recommendation

Aviation                                                                                     0                                                                                                                               0

Bike/Ped                                                                N/A                                                                                                                               N/A

Public Transportation                                           300                                                                                                                               300

Rail                                                                                     600                                                                                                                               600

Roadway                                                                1600                                                                                                                               1600

Total                                                                                     2500                                                                                                                               2500

 

 

During June and July, the MPO developed the draft assignment of the 2500 local input points to Regional Impact and cascaded Statewide Mobility projects. A draft point assignment for the 2500 local input points for all transportation modes based on the adopted prioritization methodology has been posted to the MPO’s website and the MTP/TIP subcommittee has met to review the draft points assignment. The point assignment will be posted for public review and comment through August 20, 2024 on the CAMPO website. The TCC and Executive Board will be asked to recommend and approve the final point assignment for the Regional Impact category at their respective August meetings.

 

Requested Action: Action Recommend approval of the proposed Regional Impact local input point assignment.